I frequently speak at college campuses and trade apprenticeships. Whether it be to future engineers or contractors, my technical talks typically end up covering non-technical content, specifically career development.
Plumbing contractors in the affected areas have been unable to meet demand for service and products, and cold, icy conditions have further slowed response times and interrupted supply chains.
The primary cost savings are associated with reduced diameter water service entrances, interior cold water mains/branches, interior hot water mains/branches, fittings, labor, and appurtenances.
The end of the pandemic is finally in sight as healthcare workers across the country have been receiving their first and second dose COVID-19 vaccinations.