Twenty years ago, the contemporary approach to prevent interference between simultaneously operating circulators in a hydronic system was primary/secondary piping.
An installer wants to achieve hydraulic separation between three zone circulators. He also wants to have the same supply water temperature to each zone, so he pipes up what he calls a “modified primary/secondary system.”