The expansion includes a new 23,000-square-foot truck loading and unloading facility with additional warehousing space designed to improve operational efficiency and enhance the experience for truck drivers and the warehouse team.
The division of VPC Global closed on the purchase of buildings and land with rail access on May 4 and will begin installing extrusion lines as soon as possible. The plan is to replicate the company's Kingman, Arizonia, facility and start production in 60 days.
Uponor North America held a ceremonial “pipe-cutting event” to mark the opening of its $5.5 million, 25,000-square-foot expansion to the Hutchinson, Minnesota facility.
REED Bevel Boss cordless pipe bevelers provide a safe way for operators to bevel pipe in the field. Bevel Boss trims small to large diameter plastic pipe, including pipe already in the ditch, REED notes.