On Aug. 6, MIFAB held a groundbreaking ceremony for its 68,000 sq. ft expansion. Staff with BNP’s Plumbing Group also got a tour of the current facility.
President Michael Whiteside kicking off the groundbreaking ceremony.
(From left) President Michael Whiteside, Alderman Carrie Austin and Ed Lewis of the Chicago Department of Planning and Development
Left to Right: Sophie Whiteside (daughter of Michael), Justine Whiteside (wife of Michael), Michael Whiteside (President), Carrie Austin (Alderman), Ed Lewis of the Chicago Department of Planning and Development, Courtlen Hagemeyer (C.F.O MIFAB) and Jason Gremchuk (VP of Operations).
Protective-ware for construction.
Custom MIFAB cake.
MIFAB employees and attendees celebrating the groundbreaking.
President Michael Whiteside chatting with Alderman Austin and Alderman Austin’s Chief of Staff.
President Michael Whiteside with a large grease interceptor.
Roof Drains being assembled.
Cover Shroud for MIFAB SuperMax HDPE Interceptor.
Trench drains being assembled.
Interceptor being sprayed with A.R.E epoxy coating to prevent rusting
HDPE Plastic Interceptors.
Excavation for the expansion.
Land for the 68,000 sq. ft expansion.
Barracuda 20 Double Check Valve Backflow Preventer.
Crucial piece for a Backflow Preventer.
MIFAB Training Room
Testimonial from a MIFAB customer.
President Michael Whiteside reflecting on the MIFAB grand opening.
Copyright ©2025. All Rights Reserved BNP Media.
Design, CMS, Hosting & Web Development :: ePublishing