Processes are the third component of our success strategy — organizational charts, scorecards, and processes. Two months ago, I began a three-part series to focus on each of them. This month, we are going to bring that strategy full circle by discussing processes.
Last fall, we assessed a boiler replacement project for a town hall. Three out of four existing rare condensing cast iron boilers were inoperable within two years, and seven out of eight boilers failed within 10 years. During our visit, we meticulously examined various aspects to identify any potential issues.
Air-to-water heat pumps and water-to-water geothermal heat pumps provide warm water for space heating, domestic water heating, and chilled water for cooling. Switching a hydronic heat pump system from space heating to cooling and vice versa seasonally is relatively simple. The system operating mode is changed at the thermostat or a dedicated system mode switch with heat, off, and cool settings.